Construction, finish » Finishing
----Choose---
Domestic works
External works
Nr.
Works and resource name
Measures
Quantity (enter)
Price
Sum
Info
1
Assembly of plastering angle
m
11.00
2
Plastering (lime wash)
m2
22.00
3
Plastering (plaster solution)
m2
24.00
4
Plastering (mortar)
m2
28.00
5
Facade thermal insulation (wool)
m2
31.40
6
Facade thermal insulation (polystyrene)
m2
26.50
7
Assembly of reinforce angles
m
12.20
8
Installation of reinforce layer
m2
16.80
9
Assembly of window profile PVC
m
10.50
10
Decorative plastering
m2
33.00
11
Assembly of facade boards (wood)
m2
38.00
12
Assembly of facade boards (plastic)
m2
32.60
13
Roof boarding (wood)
m2
48.00
14
Roof boarding (perforated aluminium)
m2
59.00
15
Roof boarding (steel)
m2
58.00
16
Installation of exterior hydro insulation (roll)
m2
64.00
17
Installation of exterior hydro insulation (composite)
m2
56.40
18
Laying of facade tiles (ceramic)
m2
46.00
19
Laying of facade tiles (stone)
m2
52.00
20
Laying of facade tiles (clinker)
m2
75.00
21
Assembly of facade tiles
m2
47.00
22
Assembly of facade boards (tin)
m2
36.80
23
Assembly of plastering angles
m
8.20
24
Surface flattening (up to 10 mm)
m2
18.50
25
Surface flattening (facade up to 10 mm)
m
19.60
26
Assembly of plaster pasteboard frame (walls)
m2
13.00
27
Assembly of plaster pasteboard frame (ceiling, one level)
m2
14.30
28
Assembly of plaster pasteboard frame (ceiling, double)
m2
16.50
29
Assembly of plaster pasteboard frame (decorative system)
m
42.00
30
Assembly of plaster pasteboards
m2
11.80
31
Assembly of plaster pasteboards (damp-proof)
m2
11.80
32
Assembling of plaster pasteboards (decorative)
m2
19.40
33
Daubing (macro)
m2
15.90
34
Daubing (micro)
m2
16.80
35
Decorative daubing
m2
28.10
36
Impregnation of surface (facade)
m2
12.10
37
Impregnation of surface
m2
11.60
38
Assembly of wood particle boards
m2
16.30
39
Assembly of MDF boards
m2
21.90
40
Assembly of wooden fibre boards
m2
18.20
41
Assembly of cement particle boards
m2
23.00
42
Assembly of OSB boards (6-10 mm)
m2
17.80
43
Assembly of OSB boards (12-18 mm)
m2
22.00
44
Assembly of OSB boards (20-25 mm)
m2
29.00
45
Foundation (facade)
m2
4.00
46
Foundation
m2
3.30
47
Applying of wallpaper (paper)
m2
9.80
48
Applying of wallpaper (fibreglass)
m2
9.10
49
Applying of wallpaper (textilic)
m2
14.20
50
Applying of wallpaper (phlyseline)
m2
12.50
51
Applying of wallpaper (vinyl)
m2
10.80
52
Surface preparing for painting (wood)
m2
44.00
53
Painting of surface (wood)
m2
22.60
54
Surface preparing for painting (metal)
m2
47.20
55
Painting of surface (metal)
m2
19.40
56
Painting of surface (plaster)
m2
16.30
57
Painting of walls, ceilings
m2
18.30
58
Decorative painting
m2
20.00
59
Interior decorative plastering
m2
48.90
60
Equipment of hydro insulation
m2
42.50
61
Gluing of tiles (stone)
m2
39.00
62
Gluing of tiles (slipware)
m2
37.80
63
Gluing of tiles (small, mosaic)
m2
68.20
64
Gluing of decorative stone
m2
48.00
65
Installation of doors (laminated)
unit
88.00
66
Installation of doors (veneered)
unit
95.00
67
Installation of doors (massif)
unit
140.00
68
Installation of doors (painted)
unit
125.00
69
Assembly of hinges
unit
30.00
70
Installation of door lock
unit
86.00
71
Installation of weather-strips
set
50.00
72
Installation of floorboards (conifers)
m2
46.80
73
Installation of floorboards (deciduous)
m2
56.00
74
Installation of flooring (laminate)
m2
29.50
75
Installation of flooring (parquet boards)
m2
37.00
76
Installation of flooring (parquet)
m2
63.00
77
Installation of flooring (carpeting)
m2
16.90
78
Installation of flooring (linoleum)
m2
20.80
79
Installation of flooring (pumpable)
m2
40.00
80
Installation of suspended ceiling (Armstrong)
m2
19.40
81
Installation of plinths (wood)
m
9.00
82
Installation of plinths (plastic)
m
8.50
83
Installation of plinths (ceramics)
m
18.00
84
Installation of plinths (stone)
m
35.00
85
Installation of plinths (carpeting, linoleum)
m
8.00